Hello guys
I have a doubt about Actual Cost Component Split – Cost Component Structure Change.
We need to change a assignment of cost element of a class of primary cost in the same cost component structure without addition of new cost elements.
Follow the procedure as Sap notes 0000434873 - Actual Cost Component Split – Cost Component Structure Change and 1869753 - "Controlled" changes of the cost component structure in transaction OKTZ.
Firstly, was executed OKTZ and changed the assignment of a class of primary cost that was a cost element within a Cost Component Strucuture to another cost element within the same Cost Component Strucuture . This was done at the end of September.2014 .
The following steps were done in October.2014:
CKMPRPN - Future price
MMPV -
CKME - dynamic price release
After , i executed the CK11N and checked Cost Component Split that is correct with the new assignment.
The following steps were the settlements of the orders and after the cockpit through CKMLCP .
At the end of the process (Posting Ckmlcp) , the assignment does not ocurred staying in the cost element original.
The steps I performed are correct ??
In which step of the Cockpit (CKMLCP) that occur the assigment ?
Do you have suggestions ??
Thanks in advance.
André